Meaning
Metered wholesale settlements require subtracting internal station power consumption from gross generator output to determine the net physical volume delivered to the commercial grid interconnect point. An auxiliary load deduction enforces this separation between electricity consumed behind the meter by plant equipment such as pumps, fans or control systems and the net energy entering commercial commerce. Power purchase agreements specify whether settlement schedules, capacity commitments and imbalance penalties attach to gross generator terminals or to the high-voltage commercial delivery busbar.
Excluding this house load from billable throughput prevents buyers from financing generation consumed entirely within plant boundaries. The baseline calculation stops at the primary revenue meter where transmission system operators take operational custody.
Settlement Variance
Meter placement determines whether losses and internal demands reduce the distributor’s landed invoice or remain an uncompensated generator deficit. Bilateral contracts pegging delivery to busbar injection require an auxiliary load deduction from gross generator output, exposing the project owner to variable house power costs during low-load cycling. Baseload commitments sold against busbar delivery penalties force generators to run supplemental units or buy spot energy if internal draw rises unexpectedly during summer ambient peaks.
Merchant facility margins compress when heavy draft fans or cooling water pumps operate continuously while export tariffs remain depressed.
Allocation Dispute
Disagreements emerge when off-takers demand audit rights over the revenue meters measuring parasitics while suppliers dispute auxiliary allocation formulas during partial outages. Unmetered house systems shared between adjacent generation units often require contractual allocation percentages rather than hard physical meter readings. Wholesale off-takers reject pro-rata models when one unit trips while common cooling systems draw identical auxiliary power from the remaining unit.
Contract Enforcement
Generation covenants impose fixed percentage caps on deductible parasitic losses across varying ambient temperature bands. Measured volumes exceeding contractual auxiliary load deduction allowances automatically convert to penalty settlement obligations debited from monthly fixed capacity payments.